序號
Item |
項目名稱
Name of Project |
規(guī) 模
Scale of Project |
燃 料
Fuel |
投產(chǎn)時間
Put into poduction |
備注Remark
|
1. |
總承包項目EPC Projects |
1.1
|
貴州鵬昇(集團)紙業(yè)有限責任公司年產(chǎn)60萬噸包裝紙建設(shè)項目
Guizhou PENGSHENG (Group) Paper
600,000TPA Packaging Paper Project
|
2x90t/h+1xB25MW
|
煤
coal
|
正在建設(shè)
Under construction
|
EPC
|
1.2
|
埃塞俄比亞PVC項目
PVC project in Ethiopia
|
3x15t/h boiler
|
煤、生物質(zhì)
Coal, biomass
|
正在建設(shè)
Under construction
|
EPC
|
1.3
|
孟加拉吉大港22座變電站交鑰匙總包項目
22 Substations on Turnkey Basis in Chittagong Zone, Bangladesh
|
12 nos. New 2x20/26MVA 33/11KV GIS Substation, 2 nos. of New 1x10MVA 33/11KV AIS Substation, Renovation of 04 nos. 33/11KV Substation & Upgradation of 04 nos. 33/11KV Substation
|
|
正在建設(shè)
Under construction
|
EPC
|
1.4
|
孟加拉國拉杰沙希7座變電站總承包工程
7 Substations on Turnkey Basis in Rajshahi Zone, Bangladesh
|
33/11KV 06 Nos. of 2x10/13.33MVA & 1 No. of new 1x10/13.33MVA GIS Substation
|
|
正在建設(shè)
Under construction
|
EPC
|
1.5
|
正隆越南造紙廠新設(shè)汽電廠BOP設(shè)備一套
CLVP Cogeneration Plant BOP of CHENG LOONG Paper in Vietnam
|
|
|
2018年8月
Aug. 2018
|
EPC
|
1.6
|
廣東鼎豐紙業(yè)有限公司熱電廠系統(tǒng)新建工程
Thermal Power Plant of Guangdong Dingfeng Paper
|
1x90TPH 多燃料鍋爐+1x12MW抽汽背壓機組
1x90TPH multi-fuel boiler+1xCB12MW TG unit
|
煤、樹皮、木屑和污泥
Coal, bark, sawdust, sludge
|
2016年10月
Oct. 2016
|
EPC
|
1.7
|
印尼占碑TG28 EPC工程
LPPPI TG28 EPC Project, Jambi, Indonesia
|
TG28 CC60MW and its complete system
|
|
2015年3月
March 2015
|
EPC
|
1.8
|
印尼占碑TG29 EPC工程
LPPPI TG29 EPC Project, Jambi, Indonesia
|
TG29 B2.55MW and its complete system
|
|
2015年3月
March 2015
|
EPC
|
1.9
|
海南金海漿紙業(yè)有限公司一套完整的MB6室外備料系統(tǒng)設(shè)備采購、服務(wù)和安裝
External Multi-fuel Mixing & Conveying System for MB6# 670t/h Boiler of APP Jinghai Pulp & Paper
|
生物質(zhì)1800t/d,污泥1030t/d
Biomass 1800t/d; Sludge 1030t/d
|
污泥、樹皮、木屑
Sludge, bark, sawdust
|
正在建設(shè)
Under construction
|
EPC
|
1.10
|
海南金海漿紙業(yè)有限公司一套完整的MB6室內(nèi)備料系統(tǒng)設(shè)備采購、服務(wù)和安裝
Internal Multi-fuel Mixing & Conveying System for MB6# 670t/h Boiler of APP Jinghai Pulp & Paper
|
生物質(zhì)1800t/d,污泥1030t/d
Biomass 1800t/d; Sludge 1030t/d
|
煤、樹皮、木屑、污泥
Coal, bark, sawdust, sludge
|
2016年2月
Feb. 2016
|
EPC
|
1.11
|
印尼廖省 IKPP MB24 670t/h鍋爐多種燃料配料喂料系統(tǒng)技改工程
Multi-fuel Feeding System for MB24 670t/h IKPP Riau, Indonesia
|
MB24 670t/h鍋爐多種燃料配料喂料系統(tǒng)
Multi-fuel Feeding System for MB24 670t/h Boiler
|
煤、樹皮
Coal, bark
|
2014年12月
Dec. 2014
|
EPC
|
1.12
|
印尼廖省 IKPP MB25 670t/h鍋爐多種燃料配料喂料系統(tǒng)技改工程
Multi-fuel Feeding System for MB25 670t/h IKPP Riau, Indonesia
|
MB25 670t/h鍋爐多種燃料配料喂料系統(tǒng)
Multi-fuel Feeding System for MB25 670t/h Boiler
|
煤、樹皮
Coal, bark
|
2014年12月
Dec. 2014
|
EPC
|
1.13
|
南通經(jīng)濟技術(shù)開發(fā)區(qū)中水回用示范工程(一期)
Reuse of Reclaimed Water Demonstration Project of Nantong Economic and Tech. Development Zone (Phase Ⅰ)
|
40,000t/d,零排放
Zero effluent discharge
|
|
2014年5月
May 2014
|
EPC
|
1.14
|
南通經(jīng)濟技術(shù)開發(fā)區(qū)中水回用示范工程(二期)
Reuse of Reclaimed Water Demonstration Project of Nantong Economic and Tech. Development Zone (Phase Ⅱ)
|
17,500 t/d,零排放
Zero effluent discharge
|
|
2015年5月
May 2015
|
EPC
|
1.15
|
上海太平洋化工(集團)淮安元明粉有限公司能量系統(tǒng)優(yōu)化技改項目
Power System Upgrade Project for Shanghai Pacific Chemical (Group)
|
1x75t/hCFB+1xB7MW
|
煤
Coal
|
2013年12月
Dec. 2013
|
EPC
|
1.16
|
四川鳳凰紙業(yè)有限公司熱電站
Thermal Power Plant of Sichuan Phoenix Paper
|
2×75t/h+1×C15MW
|
煤
Coal
|
2011年5月
May 2011
|
EPC
|
1.17
|
焦作瑞豐紙業(yè)有限公司生物質(zhì)廢棄物焚燒供熱系統(tǒng)工程
Paper Reject and Biomass Incineration and Heat Supplying Project of Jiaozuo Ruifeng Paper
|
1x15t/h and its complete system
|
煤、樹皮、木屑、沼氣和污泥
Coal, bark, sawdust, biogas and sludge
|
2009年12月
Dec. 2009
|
EPC
|
1.18
|
貴州博宏小河金屬鑄業(yè)公司450m3高爐煤氣發(fā)電改造工程
450m3 Blast Furnace Gas Generation Reconstruction Project of Guizhou Bohong Xiaohe Metal Casting
|
1×N6MW
|
燃氣Gas
|
2009年9月
Sep. 2009
|
EPC
|
2.
|
固廢物焚燒電站W(wǎng)aste-to-Energy Power Plant |
2.1
|
泰國PTG 24MW生物質(zhì)電站及配套工程項目
Thailand PTG 24MW Biomass Power Plant
|
100t/h鍋爐+24MW純凝機組
1×100t/h boiler+1×N24MW TG unit
|
橡膠木樹根、樹樁、木片、棕櫚葉、空果串
rubber wood roots, stumps and slabs, palm frond, empty fruit bunches (EFB)
|
正在建設(shè)
Under construction
|
施工圖設(shè)計
Detail engineering
|
2.2
|
泰國TPCH1生物質(zhì)電站及配套工程項目
Thailand TPCH1 Biomass Power Plant
|
45t/h鍋爐+10.5MW純凝機組
1×45t/h boiler+1×N10.5MW TG unit
|
橡膠木樹根、樹樁、木片、棕櫚葉、空果串
rubber wood roots, stumps and slabs, palm frond, empty fruit bunches (EFB)
|
正在建設(shè)
Under construction
|
施工圖設(shè)計
Detail engineering
|
2.3
|
泰國TPCH2生物質(zhì)電站及配套工程項目
Thailand TPCH2 Biomass Power Plant
|
45t/h鍋爐+10.5MW純凝機組
1×45t/h boiler+1×N10.5MW TG unit
|
橡膠木樹根、樹樁、木片、棕櫚葉、空果串
rubber wood roots, stumps and slabs, palm frond, empty fruit bunches (EFB)
|
正在建設(shè)
Under construction
|
施工圖設(shè)計
Detail engineering
|
2.4
|
泰國TPCH5生物質(zhì)電站及配套工程項目
Thailand TPCH5 Biomass Power Plant
|
35t/h鍋爐+7.2MW純凝機組
1×35t/h boiler+1×N7.2MW TG unit
|
橡膠木樹根、樹樁、木片、棕櫚葉、空果串
rubber wood roots, stumps and slabs, palm frond, empty fruit bunches (EFB)
|
正在建設(shè)
Under construction
|
施工圖設(shè)計
Detail engineering
|
2.5
|
長江洞庭湖新能源電力有限公司安鄉(xiāng)縣生物質(zhì)發(fā)電項目
Biomass Power Plant Project of Changjiang Dongting Lake New Energy & Power Co., Ltd.
|
2x130t/h CFB+2x30MW
|
生物質(zhì)
Biomass
|
正在建設(shè)
Under construction
|
可研
施工圖設(shè)計
Feasibility study Detail engineering
|
2.6
|
粵能(石首)生物質(zhì)發(fā)電工程
Yue Neng (Shishou) Biomass Power Plant
|
1x130t/h CFB+1x30MW
|
生物質(zhì)
Biomass
|
正在建設(shè)
Under construction
|
施工圖
Detail engineering
|
2.7
|
玖龍紙業(yè)(沈陽)有限公司熱電110噸垃圾焚燒環(huán)保鍋爐及配套發(fā)電項目
110t/h Refuse Incinerator and Power Generation Project of Nine Dragons Paper (Shenyang)
|
1 x110t/h中溫中壓固廢物焚燒爐+1 x25MW抽凝汽輪發(fā)電機組
1 x110t/h refuse incinerator+1 x25MW extraction condensing TG unit
|
污泥、造紙廢渣
Sludge, paper mill rejects
|
正在建設(shè)
Under construction
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
2.8
|
浙江金勵環(huán)保紙業(yè)有限公司固廢焚燒熱電聯(lián)產(chǎn)項目
Solid Wastes-to-Energy and Cogeneration Project of Zhejiang Jinli Paper
|
2x 90t/h高溫高壓固廢物焚燒鍋爐+1 x B12高溫高壓背壓式汽輪發(fā)電機組
2x90t/h waste incinerator+1 x B12MW TG unit
|
造紙廢渣、污泥、煤
Paper rejects, sludge, coal
|
正在建設(shè)
Under construction
|
可研
施工圖設(shè)計
Feasibility study Detail engineering
|
2.9
|
江西泰盛紙業(yè)有限公司固廢物焚燒發(fā)電(生物質(zhì)、污泥)及熱電聯(lián)產(chǎn)工程
Solid Wastes-to-Energy and Cogeneration Project of Jiangxi Taison Paper
|
3x130t/h高溫高壓燃煤鍋爐+2 x B6高溫高壓式汽輪發(fā)電機組+2x130t/h高溫高壓固廢物焚燒鍋爐+2xC30高溫高壓抽汽式汽輪發(fā)電機組
3x130t/h coal fired boiler+2 x B6MW TG unit+2x130t/h waste incinerator
+2xC30MW TG unit
|
固廢物、污泥、燃煤
Solid wastes, sludge, coal
|
調(diào)試階段
Commissioning
|
施工圖設(shè)計
Detail engineering
|
2.10
|
山東天源熱電有限公司1500t/d污泥木屑漿渣塑料焚燒處理工程
1,500t/d Wastes Treatment & Incineration Project of Shandong Tianyuan Power Plant
|
1臺260t/h流化床鍋爐
處理1500t/d污泥木屑漿渣塑料等固廢物
1x260t/h CFB boiler
Solid wastes treatment: 1,500t/d
|
污泥木屑漿渣塑料
Sludge, sawdust, pulp rejects and plastics
|
正在建設(shè)
Under construction
|
可研
初步設(shè)計
施工圖設(shè)計
Feasibility study
Basic engineering
Detail engineering
|
2.11
|
廣豐縣蘆林紙業(yè)有限公司新建年產(chǎn)70萬噸造紙項目一期自備熱電站工程
Thermal Power Plant for 700,000t/a Paper-making Project of Guangfeng County Lulin Paper
|
1x 150t/h CFB+1x B22MW TG unit
高溫超高壓(13.7MPa, 540℃)
|
煤、造紙廢渣
Coal, paper mill rejects
|
正在建設(shè)
Under construction
|
方案設(shè)計
施工圖設(shè)計
Proposal design
Detail engineering
|
2.12
|
江西五星紙業(yè)有限公司年產(chǎn)20萬噸造紙生產(chǎn)線一期工程自備熱電廠工程設(shè)計
Power Plant for 200,000t/a Paper-making production line (PhaseⅠ) of Jiangxi Five-Star Paper
|
1*130t/hCFB鍋爐+1*B18MW汽輪發(fā)電機組
1*130t/hCFB +1*B18MW TG unit
|
煤、造紙廢渣
Coal, paper mill rejects
|
2018年9月
Sep. 2018
|
施工圖設(shè)計
Detail engineering
|
2.13
|
湖北榮成紙業(yè)有限公司一期70MW熱電聯(lián)產(chǎn)專案設(shè)計工程
70MW Cogeneration Project of Hubei Longchen Paper, Phase Ⅰ
|
1x240t/h高溫高壓煤粉鍋爐+1x40MW抽備機組+2x150t/h高溫高壓循環(huán)流化床鍋爐+1x35MW抽凝機組
1x240t/h pulverized coal boiler +1xCB40MW TG unit+2x150t/h CFB boiler+1xCC35MW TG unit
|
煤、造紙固廢物
Coal, paper mill rejects
|
2017年10月
Oct. 2017
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
2.14
|
湛江晨鳴漿紙有限公司4#鍋爐、5#汽輪發(fā)電機組項目
4# Boiler and 5# TG Unit Project of Zhanjiang Chenming Pulp & Paper
|
1x400t/h循環(huán)硫化床鍋爐+1x 70MW雙抽凝汽式汽輪機組
1x400t/h CFB boiler+1x CC70MW TG unit
|
煤、污泥
Coal, sludge
|
2019月
Sep. 2016
|
可研
施工圖設(shè)計
Feasibility study Detail engineering
|
2.15
|
四川金田紙業(yè)有限公司年產(chǎn)60萬噸再生紙項目自備熱電廠工程
Power Plant for 600,000t/a Recycled Paper Project of Sichuan Jintian Paper
|
1x180t/h CFB+1xCC25MW TG
|
煤、沼氣、造紙廢渣、污泥、生物質(zhì)
Coal, biogas, paper mill rejects, sludge, biomass
|
2016年3月
Mar. 2016
|
方案設(shè)計
施工圖設(shè)計
Proposal design
Detail engineering
|
2.16
|
斯道拉恩索(廣西)漿紙有限公司廣西一體化項目
Guangxi Beihai Forest and Paper Integrate Project of Stora Enso (Guangxi) Packaging Company
|
1 X 234t/hCFB+1 X CC55MW TG unit
|
煤,生物質(zhì)
Coal, biomass
|
2016年1月
Jan, 2016
|
施工圖設(shè)計
Detail engineering
|
2.17
|
漳州市益盛環(huán)保能源有限公司垃圾發(fā)電(造紙廢渣)工程
Refuse Incineration and Power Generation Project of Zhangzhou Yisheng Environmental & Energy
|
1 X 150t/h高溫高壓造紙固廢物焚燒鍋爐+1 X C40MW高溫高壓抽汽式汽輪發(fā)電機組
1 X150t/h waste incinerator+
1 XC40MW TG unit
|
污泥、廢渣
Sludge, paper mill rejects
|
2017年8月
Aug. 2017
|
可研
施工圖設(shè)計
Feasibility study Detail engineering
|
2.18
|
宜賓紙業(yè)股份有限公司整體搬遷技改項目一期工程 熱電廠
Thermal Power Plant for Relocation & Upgrade Project (Phase 1) of Yibin Paper Company Limited.
|
2X 130t/h CFB+1 X B12MW TG units+
1 X CC35MW TG unit
|
煤,污泥,樹皮,木屑
Coal, sludge, bark, sawdust
|
2015年2月
Feb. 2015
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
2.19
|
APP海南金海漿紙業(yè)有限公司熱電廠 三期工程
Thermal Power Plant of APP Jinghai Pulp & Paper ,
Phase Ⅲ
|
1x670t/h+1xB90MW
中國最大背壓機組
Largest back pressure turbine unit in China.
|
煤、樹皮、木屑和污泥
Coal, bark, sawdust and sludge
|
設(shè)計已完成
Engineering has been completed.
|
可研
初步設(shè)計
施工圖設(shè)計
Feasibility study
Basic engineering
Detail engineering
|
2.20
|
湛江晨鳴漿紙有限公司70萬噸木漿項目自備熱電廠工程
Power Plant for 700,000t/a Wood Pulp
Mill of Zhanjiang Chenming Pulp & Paper
|
3x280t/h+2xCC66MW+CB66MW
|
煤、樹皮、污泥
Coal, bark and sludge
|
2011年10月
Oct. 2011
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
2.21
|
廣紙海珠廠區(qū)環(huán)保搬遷項目廢渣處理綜合利用工程
Solid Wastes Treatment and Comprehensive Utilization Project for Guangzhou Paper Group
|
1x350t/h+1XCC60MW
|
煤、污泥
Coal and sludge
|
2011年11月
Nov. 2011
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
2.22
|
玖龍紙業(yè)(天津)有限公司熱電站工程(第二期)
Thermal Power Plant for Nine Dragons Paper (Tian Jin) Co., Ltd, PhaseⅡ
|
燃煤電站Coal-fired power plant:
1 x670t/h+1 XC100MW
垃圾電站Refuse Incineration Plant:1x130 t/hCFB+1xC25MW
處理污泥垃圾Sludge treatment :
800t/d
|
污泥、造紙廢渣、煤
Sludge, paper mill rejects, coal
|
2011年12月
Dec. 2011
|
施工圖設(shè)計
Detail engineering
|
2.23
|
玖龍紙業(yè)(天津)有限公司熱電站工程(第一期)
Thermal Power Plant for Nine Dragons Paper (Tian Jin), (PhaseⅠ)
|
燃煤電站Coal-fired power plant:
2 x300t/h+2 XCB43MW+1 XC60MW
垃圾電站Refuse Incineration Plant:1x75 t/hCFB+1xC12MW
處理污泥垃圾Sludge treatment :
500t/d.
|
污泥、造紙廢渣、煤
Sludge, paper mill rejects, coal
|
2009年11月
Nov. 2009
|
施工圖設(shè)計
Detail engineering
|
2.24
|
永豐余造紙(揚州)有限公司熱電廠
Thermal Power Plant for Yuen Foong Yu Paper
(Yang Zhou) Co., Ltd
|
1x200t/h+1xCC40MW
|
煤、污泥
Coal, sludge
|
2006年8月
Aug. 2006
|
施工圖設(shè)計
Detail engineering
|
2.25
|
玖龍紙業(yè)(重慶)有限公司垃圾爐及配套發(fā)電工程
Refuse Incinerator and Power Generation Project for Nine Dragons Paper (Chong Qing)
|
1×130t/h CFB+1XC25MW
固廢物日處理量:1063t/d
Solid wastes treatment: 1063t/d.
|
污泥、廢渣、煤
Sludge, paper mill rejects, coal
|
2012年3月
Mar. 2012
|
可研
施工圖設(shè)計
Feasibility study Detail engineering
|
2.26
|
玖龍紙業(yè)(樂山)有限公司配套自備熱電站工程
Power Plant Project for Nine Dragons Paper (Le Shan)
|
一期工程 垃圾電站:
Phase 1: refuse incineration plant
1x55t/h+1XB6MW+1XN3MW
|
煤、造紙廢渣、鋸末、樹皮混合燃料
Coal, paper mill rejects, sawdust and bark
|
2011年5月
May. 2011
|
施工圖設(shè)計
Detail engineering
|
2.27
|
玖龍紙業(yè)(泉州)有限公司熱電聯(lián)產(chǎn)及廢渣污泥焚燒工程
Cogeneration and Sludge & Paper Rejects Incineration Project for Nine Dragons Paper (Quan Zhou)
|
燃煤電站Coal-fired power plant:
1x410T/H+1xC75MW
固廢物焚燒電站
Waste-to energy plant:
1x75T/H+1xC12MW
|
煤、固廢物
Coal, solid wastes
|
2013年10月
Oct. 2013
|
施工圖設(shè)計
Detail engineering
|
2.28
|
泰格林紙湘江有限公司熱電站
Thermal Power Plant for Tiger Forest & Paper Group
|
2x150t/h+1xCC25MW
|
煤、樹皮、污泥
Coal, bark, sludge
|
2012年7月
Jul. 2012
|
施工圖設(shè)計
Detail engineering
|
2.29
|
平湖熱電廠造紙污泥及廢渣焚燒技改項目
Sludge & Paper Slag Incineration Project for Pinghu Power Plant
|
一期工程 垃圾電站:
Phase 1 Refuse incineration plant:
2x130t/hCFB+1xCB25MW
處理造紙污泥:800t/d+ 紙渣100t/d
Paper sludge treatment: 800t/d
Paper slag treatment is 100t/d.
三期工程Phase 3 Project:
1x150t/h+1XCB30MW
|
污泥、廢渣、煤
Sludge, paper mill rejects, coal
|
一期工程:
2009年8月
三期工程:
2014年9月
Phase 1: Aug. 2009
Phase 3: Sep. 2014
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
2.30
|
華泰紙業(yè)廢渣焚燒及綜合利用項目
Sludge & Paper Rejects Incineration and Comprehensive Utilization Project for Shandong Huatai Paper
|
1x130t/hCFB+1xC12MW
處理污泥700t/d+ 120t/d渣
Paper sludge treatment: 700t/d
Paper rejects treatment is 120t/d.
|
廢渣、脫墨污泥、煤
Paper mill rejects, deinking sludge, coal
|
2009年4月
Apr. 2009
|
可研
初步設(shè)計
施工圖設(shè)計
Feasibility study
Basic engineering
Detail engineering
|
2.31
|
東莞市金田紙業(yè)有限公司熱電廠工程
Thermal Power Plant for Dongguan Jintian Paper
|
一期動力電站:1×90 t/h + 1×C15MW
二期動力電站: 2×150 t/h +1×C45MW
Coal-fired power plant (Phase 1):
1×90 t/h + 1×C15MW;
Coal-fired power plant (Phase 2):
2×150 t/h +1×C45MW
|
煤、污泥、沼氣
Coal, sludge, biogas
|
2010年10月
Oct. 2010
|
方案設(shè)計
施工圖設(shè)計
Proposal design
Detail engineering
|
2.32
|
駐馬店白云紙業(yè)有限公司年產(chǎn)13.6萬噸文化紙項目配套熱電站
Power Plant for 136,000t/a Fine Paper Project of Zhu Madian Baiyun Paper
|
垃圾電站W(wǎng)aste-to-Energy Plant
2x110t/h+1xCB18MW
處理污泥860t/d+草渣100t/d
Paper sludge treatment: 860t/h
Wheat straw treatment: 100t/h.
|
污泥、草渣
Sludge, wheat straw
|
2011年12月
Dec. 2011
|
可研
初步設(shè)計
施工圖設(shè)計
Feasibility study
Basic engineering
Detail engineering
|
2.33
|
浙江永泰紙業(yè)熱電站
Thermal Power Plant for Zhejiang Yongtai Paper
|
3×75t/h + 1×C18MW+1×B6MW
|
煤、造紙廢物
Coal, paper mill rejects
|
2008年12月
Dec. 2008
|
可研 初步設(shè)計
施工圖設(shè)計
Feasibility study
Basic engineering
Detail engineering
|
2.34
|
丹陽長豐造紙有限公司熱電站
Thermal Power Plant for Jiangsu Danyang Changfeng Paper
|
3x75t/h+1xC12MW +1Xb6MW
|
煤、造紙廢物、污泥
Coal, paper mill rejects, sludge
|
2008年10月
Oct. 2008
|
施工圖設(shè)計
Detail engineering
|
3.
|
燃煤電站Coal-fired Power Plant |
3.1
|
山鷹華中紙業(yè)熱電聯(lián)產(chǎn)項目
Cogeneration Project of Shanying Huazhong Paper
|
3x410t/h CFB+2xB60MW
|
煤
coal
|
正在建設(shè)
Under construction
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
3.2
|
玖龍紙業(yè)(沈陽)有限公司熱電380噸CFB鍋爐及配套發(fā)電項目
380t/h CFB and Power Generation Project of Nine Dragons Paper (Shenyang)
|
1 X380t/h CFB+2 X CB50MW TG units
|
煤
coal
|
正在建設(shè)
Under construction
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
3.3
|
四川金田紙業(yè)有限公司熱電廠2#鍋爐工程
Sichuan Jintian Paper
2# Boiler Project
|
1X 180t/hCFB
|
煤
coal
|
正在建設(shè)
Under construction
|
施工圖設(shè)計
Detail engineering
|
3.4
|
湖北榮成再生科技有限公司二期35MW熱電聯(lián)產(chǎn)項目設(shè)計工程
35MW Cogeneration Project for Hubei Longchen Paper, phase 2
|
一臺220t/h高溫高壓煤粉鍋爐+一臺35MW抽背機組
1X220t/h pulverized-coal boiler
+1×CB35MW
|
煤
coal
|
正在建設(shè)
Under construction
|
施工圖設(shè)計
Detail engineering
|
3.5
|
江門市長興紙業(yè)有限公司造紙生產(chǎn)線節(jié)能減排及廢水深度處理技術(shù)改造項目
Energy Saving & Emisson Reduction & Waste Water Treatment Upgrade Project for Paper Production Line of Jiangmen Changxing Paper
|
1臺130t/h次高溫次高壓燃煤鍋爐+1臺C18W+1臺B6MW汽輪發(fā)電機組
1X130t/h coal-fired boiler+1×B6MW
|
煤
coal
|
正在建設(shè)
Under construction
|
施工圖設(shè)計
Detail engineering
|
3.6
|
聯(lián)盛紙業(yè)(龍海)有限公司自備動力車間擴建及臺商投資區(qū)集中供熱工程
Power Plant Extension and Centralized Heating Project of Fujian Liansheng Paper (Longhai)
|
1臺410t/h高溫高壓燃煤鍋爐+1臺CC75MW高溫高壓抽汽汽輪發(fā)電機組
1 X410t/h coal-fired boiler+
1 XCC75MW TG unit
|
煤
coal
|
正在建設(shè)
Under construction
|
可研
施工圖設(shè)計
Feasibility study Detail engineering
|
3.7
|
撫州市四海紙業(yè)有限公司30萬噸項目配套熱電工程
Thermal Power Plant for 300,000t/a Paper-making Project of Fuzhou Sihai Paper
|
2×75t/hCFB+1×C18MW+1×B6MW
|
煤
Coal
|
正在建設(shè)
Under construction
|
可研
施工圖設(shè)計
Feasibility study Detail engineering
|
3.8
|
聯(lián)盛紙業(yè)(龍海)有限公司自備動力車間二期擴建工程
Thermal Power Plant Extension of Fujian Liansheng Paper (Longhai) (Phase 2)
|
1臺B60-8.83/0.8 高溫高壓背壓式汽輪發(fā)電機組
1X B60MW TG unit
|
|
2014年6月
June, 2014
|
施工圖設(shè)計
Detail engineering
|
3.9
|
東莞金洲紙業(yè)有限公司一期熱電工程
Cogeneration Project forDong Guan
Jinzhou Paper Co., Ltd.
|
3x240t/h+2xC60MW
|
煤
Coal
|
2012年6月
June, 2012
|
方案設(shè)計
施工圖設(shè)計
Proposal design
Detail engineering
|
3.10
|
印尼Kupang 2X18MW機組
Indonesian Kupang 2X18MW TG Unit
|
2x85t/h高溫高壓鍋爐+2x18MW凝汽式汽輪發(fā)電機組
2x85t/h boiler+2xN18MW TG units
|
煤
Coal
|
設(shè)計已完成
Engineering has been completed.
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
3.11
|
印尼ALOR燃煤蒸汽發(fā)電廠 2×3MW 機組
Indonesian ALOR Coal-fired Power Plant 2×3MW TG Unit
|
2x25t/h中溫中壓拋煤機鏈條鍋爐+
2 x 3MW中溫中壓凝汽式汽輪發(fā)電機組
2 x 25t/h spreader chain boiler
+2 x C3MW TG units
|
煤
Coal
|
設(shè)計已完成
Engineering has been completed.
|
初步設(shè)計
Basic engineering
|
3.12
|
湖南岳陽林紙集團熱電站
Thermal Power Plant for Hunan Yueyang Forest & Paper Co., Ltd.
|
3×150t/h+2×C25MW
|
煤
Coal
|
2001年12月
Dec. 2001
|
施工圖設(shè)計
Detail engineering
|
3.13
|
浙江海鹽吉安熱電站
Thermal Power Plant for Zhejiang Haiyan Ji’an
|
3×150t/h + 1×B12MW+1×C25MW,
|
煤
Coal
|
2005年10月
Oct. 2005
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
3.14
|
湖南湘衡鹽化熱電站
Thermal Power Plant of Hunan Xiangheng Salt Mine Co., Ltd
|
1×150t/h + 1×CB15MW ,
|
煤
Coal
|
2008年7月
Jul. 2008
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
3.15
|
瀏陽菲達環(huán)保熱能有限公司熱電站
Thermal Power Plant for Liuyang Feida Hongyu Thermal Power Co., Ltd
|
2×75t/h + 1×C12MW+1×B12MW
|
煤
Coal
|
2010年3月
Mar. 2010
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
4.
|
市政環(huán)保Municipal & Environment Protection |
4.1
|
米東區(qū)污水處理廠提質(zhì)改造工程
Sewage Treatment Plant for Xidong Disctrict, Urumqi, Xinjiang
Upgrade and Reconstruction Project
|
一期工程尾水處理:
規(guī)模4萬t/d
Phase 1 tail water treatment capacity 40,000t/d;
二期工程尾水處理:
規(guī)模4萬t/d
Phase 2 tail water treatment capacity 40,000t/d
|
|
正在建設(shè)
Under construction
|
可行性研究
施工圖
Feasibility study
Detail engineering
|
4.2
|
火馬沖鎮(zhèn)及工業(yè)集中區(qū)污水處理廠和配套管網(wǎng)建設(shè)項目(一期)
Sewage Treatment Plant for Huomachong Town and Industrial Concentration District
|
設(shè)計規(guī)模0.5萬m3/d
Sewage treatment capacity: 5,000m3/d
|
|
正在建設(shè)
Under construction
|
施工圖
Detail engineering
|
4.3
|
江蘇海華環(huán)保工程有限公司400t/d污泥干化及1000Nm³/h沼氣輸送工程
400t/d Sludge Drying and 1000Nm³/h Biogas Transport Project for Jiangsu Haihua Environmental Engineering Corporation
|
干化處理污泥400t/d,含水率72%降至35%以下;
沼氣管線5km,沼氣量1000Nm3/h
Sludge drying capacity 400t/d, moisture from 72% to 35%
Biogas line length 5km, 1000Nm3/h
|
|
正在建設(shè)
Under construction
|
施工圖
Detail engineering
|
4.4
|
山東海力化工股份有限公司400t/d造紙污泥干化及輸送工程
400t/d Sludge Drying and Transport Project for Shandong Haili Chemical Industry
|
干化處理造紙污泥400t/d,含水率72%降至35%以下
Sludge drying capacity 400t/d, moisture from 72% to 35%
|
|
正在建設(shè)
Under construction
|
可研
施工圖設(shè)計
Feasibility study Detail engineering
|
4.5
|
海華環(huán)保工程有限公司污泥干化及焚燒處理工程
Sludge Drying and Incineration Project for Jiangsu Haihua Environmental Engineering Corporation
|
化工污泥30BDT/D+造紙污泥200BDT/D+ 廢渣50BDT/D
Chemical sludge 30BDT/D+ Paper sludge 200BDT/D+ Paper rejects 50BDT/D
|
|
正在建設(shè)
Under construction
|
方案設(shè)計
施工圖設(shè)計
Proposal design
Detail engineering
|
4.6
|
湖南桑德新材料再生塑料資源化利用項目設(shè)計
Hunan Sangde New Materials Co., Ltd.
Recycled Plastic Utilization Project
|
年加工塑料及制品10萬噸
Plastics processing capacity: 100,000t/a
|
|
正在建設(shè)
Under construction
|
方案設(shè)計
初步設(shè)計
施工圖設(shè)計
Proposal design
Basic engineering
Detail engineering
|
4.7
|
漳州市益盛環(huán)保能源有限公司1600t/d造紙廢渣塑料造粒紙渣碎漿金屬回收環(huán)保工程
Zhangzhou Yisheng Green Energy Co., Ltd.
1,600t/d Paper Mill Rejects Pelleting and Reutilization Project
|
1600t/d造紙廢渣處理系統(tǒng)+200t/d塑料造粒系統(tǒng)
1,600t/d paper reject treatment
+200t/d plastic pelleting
|
|
調(diào)試階段
Commissioning
|
施工圖
Detail engineering
|
4.8
|
馬鞍山市天福紙箱紙品有限公司年產(chǎn)2萬噸回收塑料造粒項目
Ma’anshan Tianfu Paper Co., Ltd.Plastic Pelleting Project for 20,000TPA Paper Production Line
|
550t/d造紙輕渣;
塑料造粒規(guī)模為60t/d
550t/d paper rejects+60t/d plastic pelleting
|
|
2017年6月
June 2017
|
施工圖
Detail engineering
|
4.9
|
新疆碧水源環(huán)境資源股份有限公司奇臺縣城污水處理廠提標改造工程
Qitai County Sewage Treatment Plant Revamp Project
|
50,000 m3/d;一級A類排放
Class A of Primary Standard in GB18918-2002
|
|
2016年12月
Dec. 2016
|
施工圖
Detail engineering
|
4.10
|
自治區(qū)兒童福利指導中心污水處理站
Sewage Treatment Plant of Xinjiang Children Welfare Association Guidance Center
|
500 m3/d;一級A類排放
Class A of Primary Standard in GB18918-2002
|
|
設(shè)計已完成
Engineering completed
|
施工圖
Detail engineering
|
4.11
|
浙江富春江環(huán)保熱電公司B15機組技改工程
B15MW TG Unit Upgrade Project of Zhejiang Fuchunjiang Environment Protection
|
生活垃圾處理量
Domestic refuse treatment capacity:800t/d
|
生活垃圾
Domestic refuse
|
2010年6月
June 2010
|
施工圖
Detail engineering
|
4.12
|
新化垃圾焚燒發(fā)電廠項目
Xinhua Municipal Refuse Incineration Plant
|
700t/d; 歐盟2000排放標準
Directive2000/76/EC on
the incineration of waste
|
生活垃圾
Domestic refuse
|
正在建設(shè)
Under construction
|
可研
Feasibility study
|
4.13
|
武漢新溝垃圾發(fā)電有限公司瀝濾液處理系統(tǒng)技改工程
Leaching Liquor Treatment System Upgrade Project for Wuhan Xingou Wastes-to-Energy Power Plant
|
200 m3/d;零排放
Zero effluent discharge
|
|
2016年1月
Jan. 2016
|
施工圖
Detail engineering
|
4.14
|
淄博文昌湖旅游度假區(qū)6萬m3/d污水處理廠工程
60,000t/d Sewage Treatment Plant of Zibo Wenchang Lake Tourist Resort
|
60,000 m3/d; 一級A類排放
Class A of Primary Standard in GB18918-2002
|
|
2013年5月
May 2013
|
施工圖
Detail engineering
|
4.15
|
武漢市江北西部垃圾發(fā)電廠瀝濾液處理工程
Leaching Liquor Treatment Project of Wuhan Jiangbei Wastes-to-Energy Power Plant
|
280 m3/d; 零排放
Zero effluent discharge
|
|
2014年8月
Aug. 2014
|
可行性研究報告和施工圖
Feasibility study
Detail engineering
|
4.16
|
深圳市寶安區(qū)老虎坑垃圾焚燒發(fā)電廠瀝濾液處理工程
Leaching Liquor Treatment Project of Wuhan Baoan District Wastes-to-Energy Power Plant
|
300 m3/d; 零排放
Zero effluent discharge
|
|
2014年8月
Aug. 2014
|
可行性研究報告和施工圖
Feasibility study
Detail engineering
|
4.17
|
南山垃圾發(fā)電廠瀝濾液蒸氨處理技改工程
Leaching Liquor Treatment System Upgrade Project for Shenzhen Nanshan District Wastes-to-Energy Power Plant
|
320 m3/d; 零排放
Zero effluent discharge
|
|
2011年12月
Dec. 2011
|
施工圖
Detail engineering
|
5.
|
燃氣電廠Gas-fired Power Plant |
5.1
|
東莞理文造紙廠有限公司煤改氣工程
Lee & Man Paper Manufacturing Limited
Coal-to-Gas Project
|
2x50MW燃氣輪機+2x90t/h余熱鍋爐+2x120t/h燃氣鍋爐
2x50MW gas turbines+2x90t/h heat recovery boilers+2x120t/h gas boilers
|
|
正在建設(shè)
Under construction
|
可行性研究報告和施工圖
Feasibility study
Detail engineering
|
6.
|
分布式能源Distributed Energy |
6.1
|
瀏陽兩型產(chǎn)業(yè)園LNG分布式冷熱電三聯(lián)供工程
LNG Distributed CCHP Project of Liuyang Industrial Park
|
2臺3.5MW燃氣輪機+2臺20t/h補燃型余熱鍋爐+1臺20t/h燃氣鍋爐+庫容5800t冷庫
2 x3.5MW gas turbine+2 x20t/h recovery boiler+1 x20t/h gas-fired boiler+5800t refrigeration storage
|
|
正在建設(shè)
Under construction
|
項目申請報告和施工圖
Project application report
Detail engineering
|
7.
|
余熱發(fā)電Waste Heat Power Generation |
7.1
|
賽得利(福建)纖維有限公司熱電廠汽輪機組擴建工程
TG Extension Project of Sateri (Fujian) Fiber Co., Ltd.
|
2 x 30MW純凝式汽輪發(fā)電機組
2 x 30MW condensing TG unit
|
|
正在建設(shè)
Under construction
|
施工圖設(shè)計
Detail engineering
|
7.2
|
紫金銅業(yè)有限公司余熱發(fā)電技改工程
Fujian Zijin Copper Co., Ltd.
Waste-heat Power Generation Upgrade Project
|
1x C6MW TG unit
|
利用余熱鍋爐產(chǎn)生的次高壓飽和蒸汽4.3MPa/259℃
sub-high pressure saturated steam from recovery boiler
|
2014年11月
Nov. 2014
|
初步設(shè)計
施工圖設(shè)計
Basic engineering
Detail engineering
|
7.3
|
水城鋼鐵(集團)有限責任公司新增15MW發(fā)電機組改造工程SHUICHENG Iron and Steel (Group) Co., Ltd.15MW TG Unit Upgrade Project
|
1x15MW中溫中壓參數(shù)
|
高爐余熱發(fā)電
Waste heat from blast furnace
|
2007年9月
Sep. 2007
|