1 |
亞太紙業(yè)(山東)PD1升級改造項目PD1 Upgrading project of Asia Symbol (Shangdong) Paper Co., Ltd |
|
201708 |
|
施工圖Detail engineering |
2 |
山東博匯紙業(yè)有限公司9.5萬噸化學漿改造項目95,000t/a Chemical Pulp Line Upgrading Project of Shandong Bohui Paper Co., Ltd |
9.5萬噸/年改造為20萬噸/年 95,000t/a increased to 200,000t/a |
20180315 |
Wuhan boiler, Lanzhou evaporator |
施工圖Detail engineering |
3 |
山東博匯紙業(yè)PM1改造PM1 Upgrading, Bohui |
Dryer section upgrading, Water ring vacuum pumps changed to turbo blower |
201712 |
Voith |
施工圖Detail engineering |
4 |
山東博匯紙業(yè)PM2改造PM2 Upgrading, Bohui |
Dryer section upgrading, Water ring vacuum pumps changed to turbo blower,one coater added |
201803 |
Valmet, GAW |
施工圖Detail engineering |
5 |
東莞建暉紙業(yè)有限公司三期改造工程Phase 3 Upgrading Project of Dongguang Jianhui Paper Co., Ltd |
流漿箱更換,增加一道靴壓,干燥部及氣罩增加 Headbox to be replaced; one-nip shoe press added, dry-section and air-hood to be increased |
PM3:201807 PM4:201808 |
KBC、VOITH、HUANZHANG |
施工圖Detail engineering |
6 |
東莞銀洲紙業(yè)有限公司二期改造工程Phase 2 Upgrading Project of Dongguang Yinzhou Paper Co., Ltd |
流漿箱更換,增加一道靴壓,干燥部及氣罩增加 Headbox to be replaced , one-nip shoe press added, dry-section and air-hood to be increased |
PM3:201808 PM4:201809 |
KBC、VOITH、HUANZHANG |
施工圖Detail engineering |
7 |
東莞建暉紙業(yè)一、二期涂布白板紙改造工程Phase 1 and 2 Coated White Board Upgrading Projects of Dongguang Jianhui Paper Co., Ltd |
新增制漿能力3000t/d 3,000t/d capacity was increased |
201703 |
ANDIRITZ |
施工圖Detail engineering |
8 |
山東太陽紙業(yè)股份有限公司年產(chǎn)20萬噸高檔特種文化紙項目 200000t/a High-quality Special Fine Paper Project of Shandong Sun Paper Co., Ltd |
100,000t/a提產(chǎn)至200,000t/a 異地搬遷 100,000t/a was increased to 200,000t/a and relocated |
201712 |
Valmet |
施工圖Detail engineering |
9 |
岳陽林紙股份有限公司1#APMP生產(chǎn)線節(jié)能提質(zhì)技改項目 1#APMP Line Upgrading Project of Yueyang Forestry & Paper Co., Ltd |
150,000 t/a異地搬遷 150,000 t/a was relocated |
201711 |
Andriz |
施工圖Detail engineering |
10 |
亞太森博(山東)漿紙有限公司PD1升級改造項目PD1 Upgrading Project of Asia Symbol(Shangdong) Paper& Pulp Co., Ltd |
增加250,000t/a漿板機 250,000t/a pulp machine was increased |
201707 |
Andriz |
施工圖Detail engineering |
11 |
江蘇理文造紙有限公司PM6車間通風改造工程設計PM6 Plant Air-ventilation Upgrading Engineering Design of Jiangsu Lee & Man Paper Co., Ltd |
|
201703 |
|
施工圖Detail engineering |
12 |
廣東理文造紙有限公司PM9車間通風改造工程設計PM9 Plant Air-ventilation Upgrading Project of Guangdong Lee & Man Paper Co., Ltd |
|
201703 |
|
施工圖Detail engineering |
13 |
山東海力化工股份有限公司水處理廠改造項目Water Treatment Plant Upgrading Project of Shandong Haili Chemical-industry Co., Ltd |
60,000m3/d提產(chǎn)至180,000m3/d 60,000m3/d was increased to 180,000m3/d |
201612 |
|
施工圖Detail engineering |
14 |
永州湘江紙業(yè)搬遷至岳陽項目 Relocation Project of Yongzhou Xiangjiang Paper Co., Ltd (relocated to Yueyang) |
2臺紙機搬遷改造,化學漿系統(tǒng)局部搬遷 Two paper machines were relocated and upgraded, part relocation of chemical pulp system |
201607 |
中輕國泰 Sino-Light Guotai |
搬遷方案制定、施工圖設計 Relocation plan making and detail engineering |
15 |
景興紙業(yè)PM12改造 PM12 Upgrading of Jingxing Paper Co., Ltd |
加施膠機、后段整體改造,增加膠料制備系統(tǒng) Sizer and sizing preparation system were increased and the whole section was upgraded |
201607 |
Valmet+CEC |
改造方案制定、EPC(含土建、設備及材料供貨、安裝、調(diào)試)Upgrading plan making, EPC(including civil construction , equipment and material supply, installation and commissioning ) |
16 |
加拿大O2 Delignification Project (O2D) of Canada Howe Sound Pulp and Paper Mill |
漂白改造 Bleaching upgrading |
201503 |
Chinese Supplier |
施工圖Detail engineering |
17 |
宜賓紙業(yè)整體搬遷改造項目The Whole Relocation and Upgrading project of Yibin Paper Co., Ltd |
4300三長網(wǎng)食品卡紙機(30萬噸/年) 4,300 three-fourdrinier board machine |
201412 |
CPMC, Andritz |
EPC |
18 |
中輕國泰機械有限公司磨片分公司搬遷、提產(chǎn)擴建技改項目 Grinding-segment Subsidiary Relocation and Upgrading Project of Sino-Light Guotai Machinery Co., Ltd |
|
|
|
可研報告 Feasibility study report |
19 |
海南金海漿紙業(yè)有限公司制漿完美風暴項目、制程優(yōu)化項目 Pulp Making Perfect-Storm Project and Optimizing Project of Hainan Jinhai Pulp and Paper Co., Ltd |
4800t/d提產(chǎn)至5200t/d 闊葉化學漿 LBKP 4,800t/d was increased to 5,200t/d |
201405 |
|
施工圖設計、含整個生產(chǎn)線的梳理、填平補齊,正在進行Detail engineering design including the whole production line was combed, filled and added, on progress |
20 |
永州湘江紙業(yè)公司化木漿挖潛降耗與公司節(jié)能減排技術改造項目 Chemical & Wood Pulp Energy-saving and Emission Reduction Technical Upgrading Project of Yongzhou Xiangjiang Paper Co., Ltd |
70,000t/a提產(chǎn)至100,000t/a 70,000t/a was increased 100,000t/a |
201403 |
|
施工圖設計 Detail engineering |
21 |
沅江紙業(yè)有限責任公司漿堿平衡技術改造項目 Pulp and Alkali Balance Upgrading Project of Yuanjiang Paper Co., Ltd |
12萬噸化機漿改造 120,000t chemi-mechanical pulp upgrading |
201301 |
|
施工圖設計 Detail engineering |
22 |
廣東華泰紙業(yè)有限公司一期工程Phase 1 Project of Guangdong Huatai Paper Co., Ltd |
20萬噸/年新聞紙和文化紙 異地搬遷 200,000t/a newsprint and fine paper were relocated |
201205 |
從黑龍江齊齊哈爾搬遷改造到廣東江門 Relocated to Guangdong Jiangmen from Helongjiang Qiqihaer |
搬遷方案制定、施工圖設計 Relocation plan making, detail engineering design |
23 |
南紙異地遷建9.6萬噸竹(木)纖漿泊技改項目Relocation and Building of 96,000t Bamboo(wood) Pulp Upgrading Project of Nan Paper Co., Ltd |
350噸溶解漿(漿粕) 350t dissolving pulp |
|
|
可研報告于2012年初完成 Feasibility study report was completed in the beginning of 2012 |
24 |
上海中板紙業(yè)搬遷改造項目Upgrading Project of Shanghai Zhongban Paper Co., Ltd |
2400白紙板機搬遷改造 2,400 white board machine relocation and upgrading |
200202 |
|
施工圖設計 Detail engineering |
25 |
上海新倫紙業(yè)3200紙機改造項目3,200 Paper Machine Upgrading Project of Shanghai Xinlun Paper Co., Ltd |
3200白紙板機升級改造 Upgrading of 3,200 white board machine |
200104 |
Valmet, Voith |
施工圖設計 Detail engineering |