1 |
江蘇博匯紙業(yè)有限公司二期年產(chǎn)100萬噸高檔包裝紙板項目1,000,000t/y FBB Line, Jiangsu Bohui Phase 2 |
化機漿BCTMP: 1500+750t/d 木片處理能力Chip handling:710m3l/h |
楊木+桉木 Poplar+ Eucalyptus |
100%外購木片 100% Purchased Chips |
Est. 2018.12 |
FMW |
可行性、施工圖 Feasibility study and detail engineering |
2 |
江蘇博匯紙業(yè)股份有限公司年產(chǎn)75萬噸高檔包裝紙板工程75,000,000t/y FBB Line, Jiangsu Bohui Phase 1 |
化機漿BCTMP: 2×750t/d 木片處理能力Chip handling:500m3l/h 木片最大輸送能力Maximum chip conveying capacity:5000m3l/h |
楊木+桉木 Poplar+ Eucalyptus |
100%外購木片 100% Purchased Chips |
2012.10 |
FMW |
可行性、施工圖 Feasibility study and detail engineering |
3 |
山東博匯紙業(yè)股份有限公司15萬噸/年化機漿工程(二期)150,000 t/y BCTMP Line, Shandong Bohui ( Phase 2) |
化機漿BCTMP: 450t/d 木片處理能力Chip handling:400m3l/h |
楊木+桉木 Poplar+ Eucalyptus |
100%外購木片 100% Purchased Chips |
2009.12 |
Mesto |
施工圖 Detail engineering |
4 |
山東博匯紙業(yè)股份有限公司20萬噸/年化機漿工程(一期) 200,000t/y BCTMP Line Shandong Bohui ( Phase 1) |
化機漿BCTMP: 600t/d 原木處理能力Wood handling:180m3sob/h 木片處理能力Chip handling:600m3l/h |
楊木+桉木 Poplar+ Eucalyptus |
100%自削片或100%外購木片 100% Self-Chipped or 100% Purchased Chips |
2005.02 |
Metso |
可行性、施工圖 Feasibility study and detail engineering |
5 |
山東太陽紙業(yè)有限公司化學機械漿工程(四期)Shandong Sun Paper APMP Line,Phase 4 |
化機漿APMP:450t/d 木片處理能力Chip handling:450m3l/h |
楊木+桉木 Poplar+ Eucalyptus |
100%外購木片 100% Purchased Chips |
2012.10 |
Andritz |
施工圖 Detail engineering |
6 |
山東太陽紙業(yè)有限公司化學機械漿工程(三期)Shandong Sun Paper APMP Line,Phase 3 |
化機漿APMP:450t/d 木片處理能力Chip handling:450m3l/h |
楊木+桉木 Poplar+ Eucalyptus |
100%外購木片 100% Purchased Chips |
2011.06 |
Andritz |
施工圖 Detail engineering |
7 |
山東太陽紙業(yè)有限公司化學機械漿工程(二期)Shandong Sun Paper APMP Line,Phase 2 |
化機漿APMP:500t/d 木片處理能力Chip handling:500m3l/h |
楊木+桉木 Poplar+ Eucalyptus |
100%外購木片 100% Purchased Chips |
2009.04 |
Andritz |
施工圖 Detail engineering |
8 |
山東太陽紙業(yè)有限公司化學機械漿工程(一期)Shandong Sun Paper APMP Line,Phase1 |
化機漿APMP : 300t/d 原木處理能力Wood handling:90m3sob/h 木片處理能力Chip handling:300m3l/h |
楊木+桉木 Poplar+ Eucalyptus |
100%自削片或100%外購木片 100% Self-Chipped or 100% Purchased Chips |
2007.12 |
Acrowood |
施工圖 Detail engineering |
9 |
印尼OKI 項目Indonesia OKI project |
化學漿LBKP:8400t/d 原木處理能力Wood handling:14*300m3sob/h 木片處理能力Chip handling:2*4100m3l/h |
相思+桉木Acacia & Eucalyptus |
100%自削片 100% Self-Chipped Chips |
2015.12 |
Andritz+Local Suppliers |
施工圖 Detail engineering |
10 |
廣西金桂漿紙業(yè)有限公司 (二期)工程JGAPP (Phase 2 ) |
化機漿BCTMP: 750 t/d 原木處理能力Wood handling:160m3sub/h |
桉木Eucalyptus |
100%自削片 100% Self-Chipped Chips |
2012.09 |
Local Suppliers |
初步設計、施工圖 Basic engineering and detail engineering |
11 |
廣西金桂漿紙業(yè)有限公司 (一期)工程JGAPP (Phase 1) |
化機漿BCTMP: 2x750 t/d 原木處理能力Wood handling:3x160m3sub/h 木片處理能力Chip handling:500m3l/h |
桉木Eucalyptus |
100%自削片 100% Self-Chipped Chips |
2010.12 |
Kastraco& Bruks |
初步設計、施工圖 Basic engineering and detail engineering |
12 |
斯道拉恩索(廣西)林紙一體化項目Guangxi Beihai Stora Enso Forest and Paper Integrate project |
化機漿BCTMP: :600t/d 原木處理能力Wood handling:120m3sub/ |
桉木Eucalyptus |
100%自削片 100% Self-Chipped Chips |
2015.12 |
Andritz |
施工圖 Detail engineering |
13 |
岳陽林紙股份有限公司1#APMP生產(chǎn)線節(jié)能 提質(zhì)技改項目工程Relocating & Upgrading of 1# APMP line, Yueyang Forest Paper Co., Ltd. |
化機漿PRC-APMP Line: 450t/d 原木處理能力 Log Handling: 110m3sob/h 木片處理能力Chip handling:450m3l/h |
楊木+桉木 Poplar+ Eucalyptus |
100%自削片或外購 100% Self-Chipped or 100% Purchased Chips |
計劃Planned 2017.11 |
Andritz |
施工圖 Detail engineering |
14 |
湖南泰格林紙集團沅江紙業(yè)責任有限公司年產(chǎn)12萬噸輕型紙綜合技改項目120,000 t/y of Lightweight Paper Line, Hunan Tiger Forest Paper Group ,Yuanjiang Paper Mill |
化機漿APMP:300t/d 木片處理能力Chip handling capacity:100m3l/h |
楊木 Poplar |
100%自削片或外購 100% Self-Chipped or 100% Purchased Chips |
2013.01 |
Andritz |
可行性、施工圖 Feasibility study and detail engineering |
15 |
岳陽紙業(yè)集團有限責任公司年產(chǎn)18萬噸低定量涂布紙工程Yueyang Paper, 180,000t/y of LWC Line |
化機漿APMP:400t/d 原木處理能力Wood handling:120m3sob/h 木片處理能力Chip handling:400m3l/h |
黑楊 Poplar |
100%自削片或100%外購木片 100% Self-Chipped or 100% Purchased Chips |
2003.06 |
Andritz |
可行性、初步設計、施工圖 Feasibility study, basic engineering and detail engineering |
16 |
郴州市裕農(nóng)紙業(yè)有限公司9.8萬噸化機漿擴改工程Chenzhou Yunong Pulp Mill 98,000 tons of Chemical Pulp Upgrading Project |
化機漿450t/d Chemi-mechanical pulp: 450t/d 原木處理能力Wood handling capacity:110m3sub/h 木片處理能力Chip handling capacity:450m3l/h |
桉木Eucalyptus |
70%自削片或100%外購木片 70% self-Chipped or 100% Purchased Chips |
2012.04 |
Andritz |
可行性、施工圖 Feasibility study and detail engineering |
17 |
福建省青山紙業(yè)股份有限公司制漿系統(tǒng)技改工程Qingshan Paper Co., Ltd. Fujian Province Pulp System Technical Upgrading Project |
溶解漿Dissolving pulp 600t/d 木片處理能力Chip handling capacity:500m3l/h |
松木 Pine |
100%外購木片 100% Purchased Chips |
2011.10 |
Andritz |
施工圖 Detail engineering |
18 |
緬甸YENI制漿造紙工程YENI Pulp & Paper Project, Myanma |
化機漿板工程CTMP: 50t/d 化學竹漿Chemical bamboo pulp 80t/d 原木處理能力Wood handling:40m3sob/h 竹子處理能力Bamboo handling:2x30m3sob/h |
混合硬雜木&竹子 Mixed hard wood &bamboo |
100%自削片 100% Self-Chipped Chips |
2008.10 |
Metso Paper |
可行性、初步設計、施工圖、技術(shù)承包 Feasibility study, basic engineering, detail engineering and technology contracting |
19 |
南寧金浪漿業(yè)有限公司年產(chǎn)5萬噸化機漿技改項目Nanning Jinlang Pulp Industry Co., Ltd. China 50,000 TPA of Chemical Pulp Technical Upgrading Project |
化機漿50t/d Chemi-mechanical pulp: 50t/d 原木處理能力Wood handling capacity:40m3sob/h 木片處理能力Chip handling capacity:100m3l/h |
桉木Eucalyptus |
100%自削片或100%外購木片 100% Self-Chipped or 100% Purchased Chips |
2007.12 |
Andritz, |
施工圖 Detail engineering |
20 |
河南新鄉(xiāng)新亞紙業(yè)集團年產(chǎn)10萬噸化機漿及15萬噸涂布白卡紙工程Xinxiang Xinya Paper Co., Ltd., Henan, China 100,000 TPA of Chemical Pulp and 150,000 TPA of Coated Cardboard |
化機漿300t/d Chemi-mechanical pulp: 300t/d 原木處理能力Wood handling capacity:110m3sob/h 木片處理能力Chip handling capacity:300m3l/h |
楊木 Poplar |
100%自削片或100%外購木片 100% Self-Chipped or 100% Purchased Chips |
2006.12 |
Andritz, |
可行性、施工圖 Feasibility study and detail engineering |
21 |
福建騰榮達制漿有限公司絨毛漿技改工程 Fujian Tengrongda Pulp Making Co., Ltd. China Nap Pulp Technical Upgrading Project |
絨毛漿100t/d Nap Pulp 100t/d 原木處理能力Wood handling capacity:60m3sob/h 木片處理能力Chip handling capacity:200m3l/h |
杉木Fir |
100%自削片或100%外購木片 100% Self-Chipped or 100% Purchased Chips |
2003.09 |
Metso Paper |
方案、施工圖 Plan and detail engineering |
|
|
|
|
|
|
|
|